{"id":425,"date":"2025-06-25T14:16:28","date_gmt":"2025-06-25T14:16:28","guid":{"rendered":"http:\/\/www.inter-book.com\/?p=425"},"modified":"2025-06-30T13:14:45","modified_gmt":"2025-06-30T13:14:45","slug":"assam-ongc-clears-rig-base-at-rds-site-begins-final-phase-of-well-control-amid-flood-challenges","status":"publish","type":"post","link":"http:\/\/www.inter-book.com\/index.php\/2025\/06\/25\/assam-ongc-clears-rig-base-at-rds-site-begins-final-phase-of-well-control-amid-flood-challenges\/","title":{"rendered":"Assam: ONGC clears rig base at RDS site, begins final phase of well control amid flood challenges"},"content":{"rendered":"
ONGC achieved a crucial step at the RDS site by removing tubing stands from the rig derrick, paving the way for rig base removal and capping stack installation. A temporary increase in non-toxic gas discharge is expected during the BOP dismantling, posing no risk beyond 500 meters. <\/p>\n","protected":false},"excerpt":{"rendered":"
ONGC achieved a crucial step at the RDS site by removing tubing stands from the rig derrick, paving the way for rig base removal and capping stack installation. A temporary<\/p>\n