{"id":472,"date":"2025-06-23T19:14:14","date_gmt":"2025-06-23T19:14:14","guid":{"rendered":"http:\/\/www.inter-book.com\/?p=472"},"modified":"2025-06-30T13:16:52","modified_gmt":"2025-06-30T13:16:52","slug":"transcos-seek-gradual-weaning-of-incentive","status":"publish","type":"post","link":"http:\/\/www.inter-book.com\/index.php\/2025\/06\/23\/transcos-seek-gradual-weaning-of-incentive\/","title":{"rendered":"Transcos seek gradual weaning of incentive"},"content":{"rendered":"
Private power transmission companies are advocating for a phased reduction of incentives for interstate renewable energy transfer, rather than an abrupt cut. The Electric Power Transmission Association (EPTA) has proposed a milestone-based framework, allowing delayed projects to still benefit from the Inter-State Transmission System (ISTS) waiver. EPTA suggests a gradual 10% annual withdrawal, easing the impact on green power costs. <\/p>\n","protected":false},"excerpt":{"rendered":"
Private power transmission companies are advocating for a phased reduction of incentives for interstate renewable energy transfer, rather than an abrupt cut. The Electric Power Transmission Association (EPTA) has proposed<\/p>\n